Date of realisation: March / April 2011
Investor: Bhutan
Project scope: Designing, delivery and installation of two overhead travelling cranes Q = 80/15/1 t; L = 18,2 m with the hoist winches and the passable hoist designated for performing installation and repair works in the hydropower plant in Dagachh in Bhutan. The cranes must be able to work individually and in tandem with one another.
Back

Copyright © 2009-2013 Rialex Crane Systems Powered by Coltrino CMS Designed by Misme New Media