Date of realisation: 2012
Investor: ELEKTROWNIA DOLNA ODRA Nowe Czarnowo
Project scope: Modernisation of RV132 WW2 Car Dumper. The scope included preparation of an expert’s opinion, design of the drum geometry repair and preparation of technical documentation. A new explosion-proof drive system for Ex22 zone was delivered, mounted and commissioned. The scope also included replacement and modernisation of the control system, operator’s panel and control panel. The equipment was entered in the register kept by the Transport Technical Supervision.