Date of realisation: 2013
Investor: Opole Power Plant
Project scope: Design, delivery, assembly and start-up of mechanical, hydraulic, power and control systems of ŁWKS 500 wheel and track loader. The modernisation required reconstruction of the mechanical, hydraulic and central greasing system. The basic aim of the modernisation as regards electrical works was to introduce modern solutions of power and control systems made with the use of microprocessor technology and in consideration of requirements of the procurer and in compliance with the current standards and directives.
Back

Copyright © 2009-2013 Rialex Crane Systems Powered by Coltrino CMS Designed by Misme New Media