Date of realisation: 2005
Investor: ZEC Wrocław
Project scope: Modernization of the grab crane of capacity Q=10t installed in the transshipping port. The project scope includes modernization of the power transmission system. Brand new grab closing and lifting mechanisms were used fitted with new load limiters with the strain gauge installed directly on ropes. Along with the installation of new devices also complex replacement of the three-phase and control equipment of the crane rotating mechanism was carried out.