Modernisation of the wagon tippler in a power plant
Client
Dolna Odra Nowe Czarnowo Power Plant
Date of execution:
2012
Modernisation of the wagon tippler type RV132 WW2. The scope of modernisation included the preparation of an expert opinion, a barrel geometry repair plan and technical documentation. A new explosion-proof tippler drive system for the Ex22 zone was delivered, installed and commissioned. The control system, operator panel and control panel was also replaced and modernised. The machine is registered in the Transport Technical Supervision Office.