Modernisation of the wheeled rail excavator in a power plant
Client
Opole Power Plant
Date of execution:
2013
Design, delivery, installation and commissioning of mechanical, hydraulic, power and control systems of the ŁWKS 500 wheeled rail loader. Modernisation required the reconstruction of mechanics, hydraulics and central lubrication. The main objective of the electrical system modernisation was to introduce modern solutions for power supply and control systems, made in microprocessor technology, taking into account the requirements of the customer and in accordance with applicable standards and directives.