Overhead cranes for a copper smelter
Client
KGHM POLSKA MIEDŹ S.A. Legnica
Date of execution:
2013
Design, construction, delivery, and installation of two specialised cranes with a lifting capacity of 6.3 + 6.3 tonnes and a span of 28.5 metres. The cranes are powered via a trolley duct system. As part of the project, the crane tracks with a length of 90 metres were replaced. For the construction of new tracks, crane rails fixed with the use of a flexible rail fastening system (Rialex SEMS) were used, which maximised the trouble-free operation of cranes and the durability of tracks. The task also included the dismantling of the old overhead cranes in the facility. The work was carried out in very difficult conditions over electrolysers.
Do you need help with your order?
Together we will find the best solution for your business!
EXPAND FORM
Do you need help with your order?
Together we will find the best solution for your business!
Message*
They trusted us